Beneath The Red Line

$400.00

Painted on July 31, 2021 on a picture perfect day. Sometimes it’s noisy down here, but this was all set to be a quiet morning until the landscape crew came with their powered weed whackers to trim the grassy area to the left. That area is the ending point of the Towpath Trail and is going to be turned into a park, with 4 out of 5 surface parking lots being eliminated in the process. Hallelujah!

Product Description

facebooktwitterpinterestfacebooktwitterpinterest
facebooktwitterinstagramfacebooktwitterinstagram

Carter Rd Bridge and friend.

14×20 Arches rough watercolor paper.