Cleveland Flats, Detroit Superior Bridge
$350.00
This is at the location of what I believe will be the future Canal Basin Park, of which the first stage is scheduled to be completed in 2021. Painted June 16th, 2020.
$350.00
This is at the location of what I believe will be the future Canal Basin Park, of which the first stage is scheduled to be completed in 2021. Painted June 16th, 2020.